News
10" High Pressure Double Line Stop August 27, 2010 8/27/10 -Portland, CT: The Jack Farrelly Company's Service Department performed a 10" Double Line Stop on the local water company's transmission main that runs at about 110 PSI. Our stops went within 2.5 hours on site allowing the contractor to lower a section of the main as part of a box-culvert replacement job. |