News
Plymouth, Ma. Sewer Force Main Leak December 22, 2015 The Jack Farrelly Company was called into action 3 days before Christmas 2015 for a leak in a 30" sewer force main in Plymouth, Ma. Four (4) 30" line stops were installed as well as 30" valves and fittings supplied to help in repairs and for the by-pass which was set up by C.B. Utilities.
|