News
12" Single Line Stop September 22, 2010 9/22/2010 - Collinsville, CT: The Jack Farrelly Company's Service Department performed a 12" Line Stop to allow the contractor to cut out an old lead joint tee which was leaking, and install a new 12" gate valve. Our stop was "bubble tight" (as it's known in the industry), leaving the contractor with a dry, workable hole. |