News
24" Single Line Stop Lowell, MA May 11, 2010 The Jack Farrelly Company Service Department completed a 24" Single Line Stop for MIG Corporation out of Acton, MA on their ongoing Rt. 110 & Rt. 38 bridge rehab project. The Line Stop was done on one side of the bridge while the city's (Lowell, MA) valve was shut on the other side of the bridge allowing MIG to cut in a new 24" gate valve so they can have control of the line to do work on the section of pipe that runs under the bridge. |