News
January 15, 2013 Charleston, West Virginia The Jack Farrelly Co's Service Division travels to Charleston,West Virginia to install a 20" line stop. With the water flow stopped in a river main crossing the Kanawha River, a new control valve is installed and the broken main is repaired.
|